Include the "Use Minimum" and "Use Allowance" boxes during changeout process
During the meter/register change out process, have the "Use Allowance" and "Use Minimum" from the Utilization tab to avoid the double charge to the customer.
1
vote

Upon research with the implementation manager, this really is a non-issue as long as the outgoing meter is marked as 'changed out' and not just 'removed' when doing the change out process. If the meter is just 'removed' and another meter installed, the account will charge two minimums after the 'removal' where as a 'changed out' meter will ignore the 'Use Minimum' and 'Use Allowance' checkboxes.